WHY CHOOSE US ?
one.We are professional electrical motor manufacture for 30 several years considering that 1988.
2.We have best quality supplies to make our electric powered motors very best overall performance.
3.Our goods are a hundred% manufacturer new , 100% cooper wire , a hundred% output.
four.We have superior check equipment to make the a hundred% competent merchandise for our buyers.
five.We have innovative winding , painting, assembly and packing and so on. generation line which make our goods great visual appeal, great efficiency and nicely packaged.
6.We have innovative and automated equipment this sort of as large velocity punching equipment, swing punching machines, devices to form the rotors ,stators and so forth. in one particular piece, automatic packing equipment which can make nice look and very good performance motors even though lessen the labor cost and mechanical loss .
7.We have specialist fiscal office who are excellent at calculating and managing the expense and cash operation which could make most favorable charges for our consumers.
Company Introduction
DAJI Team. ZHangCZPTG DAGAO CZPT MOTOR Co., Ltd, is professional enaged in electric motor producing for 30 years because 1988. The headquarters is situated in ZheJiang city, group with four manufacturing bases in zHangCZPTg and ZheJiang , has far more than 300 countrywide product sales facilities and special organizations, and exported to much more than 50 countries and areas.
Workshop Screen
Certification
Item Introduction
The collection motors are derived from the flameproof a few-stage asynchronous motors for YBF3 collection enthusiasts.It is suitable for all kinds of explosion-proof ventilator in coal mine which require to have phase speed regulation.
YBF3 Series Flameproof variable pole multi – velocity motor for fan | |
1). Frame: | 90~225mm |
two). Energy: | 1.1~45 kW |
3). Voltage: | 380V |
four). Frequency: | fifty Hz or CZPTized |
five). Shell: | solid iron body, aluminum body |
six). Pole: | two, four, six, 8, 10 |
7). Safety diploma: | IP55 |
eight). Insulation class: | F |
9). Cooling approach: | IC411, IC410 |
ten). Duty Variety: | S1 |
eleven). Mounting arrangement: | B3, B5, B30, B35 |
twelve).Certificates: | CE, CCC, CZPT, SGS and so on |
Operating Condition: ambient temperature is -15oC to 35oC (mine) or fortyoC (factory), and underneath one thousand meters above sea stage
Terminal Box Construction:
The moter terminal box has superb explosion-proof construction overall performance and large defense grade, and has a huge cavity for wiring. The incoming line is divided into two varieties of framework: rubber sheath cable and metal pipe wiring. It can be produced one particular inlet entrance or two inlet entrance respectively in accordance with the requirements of various starting variety.
Body | Amount of Entrance | The Max Outer Diameter of Inlet Cable | Thread of Conduit Entry |
63~seventy one | one | Φ25 | M30*2 |
80~one hundred | a single | Φ25 | M30*two |
112~132 | |||
a hundred and sixty~a hundred and eighty | 1 | Φ35 | M36*2 |
200~225 | a single | Φ42 | M48*two |
250~280 | a single | Φ50 | M64*2 |
250~280 | two | Φ42 | M48*two |
315~355 | two | Φ50 | M64*2 |
315~355 | 1 | Φ64 | M72*two |
Manufacturing unit Rewards
one. thirty many years heritage
2. Competitive price
3. Guaranteed quality
4. Fast supply time: normal models about 15-twenty days , strange versions about 30 days
five. 100% testing after every procedure, a hundred% raw materials are selective
6. High efficiency
7. Low noise
8. Long daily life
9. Power preserving
10. Slight vibration
eleven. It is newly designed in conformity with the relevant rules of IEC standards
12. Professional Service
13. Warranty: 12 months from date of delivery
14. Main Market: South America, CZPTpe, Middle East, Southest Asia, Africa and so on
fifteen. We have certificates for CE, CCC, CZPT, SGS and so on.
Our Provider
one. We valuing each and every buyer.
2. We cooperate with customer to design and build new solution. Provide OEM.
3. twenty five-thirty times leading time.
4. We’d like to help you arranging shipping things, check items or other people on your ask for.
FAQ
Q: What is your delivery time?
A: Within 20-twenty five days after receiving deposit.
Q: Do you offer OEM service?
A: Yes. We take OEM services.
Q: What is your MOQ of this merchandise ?
A: 10 PCS for every item.
Q: Can we sort our brand name on it?
A: Of course, of system.
Q: Where is your loading port ?
A: HangCZPT Port, ZheJiang Port, China.
Q: What is your production capability?
A: About 1000 PCS for every working day.
Purchasing Instructions
one. Remember to show the fram measurement, energy, synchronous speed, voltage, frequency, set up measurements, inlet cable entrance variety and route of rotation and many others.
two. If have unique request, this kind of as the voltage, frequency, protection diploma, duplex shaft, path of rotation, temperature checking device, set up measurements, bearing oil discharge unit and so on, please show in specifics in the ordering contract and indicator specialized settlement if required.
3. When ordering other sequence of motor and derived motor in the sample, you should comply with this instruction CZPT more notice, thank you for your cooperation!